Design released for Coomera Connector Stage 1 North

The design for the first section of the Coomera Connector has been released, showing detailed layouts for the Stage 1 North package from Shipper Drive to Helensvale Road.

Over the past 15 months, the department  has been refining and improving the design. 

The detailed design newsletter was distributed to around 10,000 residents and businesses in the surrounding area. It was also sent to our email database of around 2000 registered recipients.

Site investigation works have been underway for some time. Main construction works such as vegetation clearing, earthworks and structures have now commenced.